The underlying infrastructure netwroks that connect the various CFC projects together within the overall plot of land.

The project comprised of :

  • Nearly 240,000 square metres of asphalt roads and interlocked tiles.
  • An irrigation network of over 12km.
  • A potable water network of 8km.
  • A waste water network of 14km.
  • An electrical network consisting of 80km of medium-voltage cables.
  • State-of-the-art street lighting consisting of over 500 poles and connected by 24km of cables.
  • A district cooling network covering 17 km of piping, and;
  • A fibre optics network utilising of 67km of fibre optic cables.